Continue with IGO Jobs

Sign in to continue.

Sign in

Advanced Search

Tailor the filters to find your right fit.

Experience Level

Consultant - Environmentally Sound Mercury Waste Management

Job details and profile match

WHO
Kampala, Uganda1 Dec 2026Mid level · CON17 Nov 2026English

Report a problem

Consultant - Environmentally Sound Mercury Waste Management — WHO

What needs correcting?

Overview

WHO Uganda seeks a consultant on environmentally sound mercury waste management. The consultant will prepare an inception workplan, develop training modules and standard operating procedures, produce guidance on mercury-device phase-out and alternatives, create facilitator and participant materials, and report on training delivery, evaluation and final consultancy outputs.

Keywords:

  • Waste Management
  • Lifecycle Management
  • Healthcare Waste Management
  • Environmentally sound disposal technologies
  • Mercury Phase-Out Module
  • SOPs
  • Minamata and Basel Conventions

Key details

Job ID
2604987
Job type
Consultancy · Full-time
Contract duration
1 month
Function
Education, Training & Capacity Building · Engineering, Infrastructure & Technical Services
Sector
Climate, Environment & Biodiversity, Global Health & Nutrition

Skills & Tools

Job Description

Consultants Environmentally Sound Mercury Waste Management - (2604987)

Contractual Arrangement: External consultant

Contract Duration (Years, Months, Days): 1 month

Job Posting

Nov 17, 2026, 1:32:37 PM

Closing Date

Dec 1, 2026, 10:59:00 PM

Primary Location

Uganda-Kampala

Organization

AF_UGA Uganda

Schedule

Full-time

IMPORTANT NOTICE: Please note that the deadline for receipt of applications indicated above reflects your personal device's system settings.

The Consultant shall deliver the following:

  1. Inception Report (within 3–5 days of contract signature), including methodology and workplan.
  2. Draft Training Package, including SOPs and modules (for review).
  3. Final Compendium of Training Materials, incorporating comments from WHO, MoH, and NEMA.
  4. Mercury Phase-Out Module, including:

o Strategies for device phase-out o Stock management guidance o Specifications and list of alternatives

  1. Training Facilitation Materials, including presentations, facilitator guides, and participant manuals.
  2. ToT Training Report, including participant list, evaluation results, and recommendations.
  3. Final Consultancy Report, summarizing all activities, outputs, and recommendations.

Duration and Timeline The assignment will be conducted over 30 working days, within approximately one (1) month. A detailed timeline will be agreed upon in the inception phase. Adjustments may be made in consultation with WHO, MoH, and NEMA without affecting overall objectives.

  1. Qualifications, experience, skills and languages

Identify the educational qualifications and expertise needed for the terms of reference outlined above.

Educational Qualifications Advanced university degree (Master’s or above) in Environmental Health, Environmental Engineering, Public Health, Chemistry, or related field.

Experience Essential:

  • At least 5–10 years of relevant professional experience in hazardous waste management, specifically mercury lifecycle management.

Desirable:

  • Demonstrated expertise in:

o Healthcare waste management systems o Environmentally sound disposal technologies o International conventions (Minamata and Basel Conventions)

Skills/Knowledge

  • Proven experience in developing training materials and conducting capacity-building programmes.
  • Strong analytical, communication, and facilitation skills.
  • Experience working with government institutions and international organizations is an added advantage.

Languages and level required Fluency in written and spoken English .

Refer & Earn!

A little shout-out goes a long way!